Showing posts with label integrated public transport. Show all posts
Showing posts with label integrated public transport. Show all posts

Saturday, June 1, 2024

A NEW RAILWAY STATION FOR CAERLEON

Plaid Cymru, Newport East Westminster candidate Jonathan T Clark has called for a new railway station to serve Caerleon and Ponthir to be added to the original Burns Commission recommendations, which we are still waiting for,  as a matter of urgency.  

 

Jonathan T Clark, Plaid Cymru Newport East Westminster candidate said:

 

“I like many people in Newport, welcomed the commitment, a few years ago, to build new railway stations at Tredegar Park, Somerton, Llanwern, and Magor. We need ground broken sooner rather than later to bring the new railway stations into being, to provide alternative means of getting around our city and elsewhere. The new stations are an absolute necessity, but I have serious concerns that no railway station to serve Caerleon / Ponthir has been included, this would a real asset to both communities.”

 

Jonathan concluded:

 

“The absence may show an alarming lack of understanding of local transport issues, or to literal linear focus on the problems of the M4 or it could be simply a glaring oversight. In this case it would ensure that the residents of Caerleon / Ponthir have little choice but to drive to Newport, Cwmbran and beyond even to reach another railway station. The lack of a proposed railway station to serve the communities of Caerleon / Ponthir needs to be revisited as a matter of urgency if the Labour in Wales government are serious about providing decent integrated public transport for all parts of Newport and cutting congestion on the M4 and around our city.” 

 

DIWEDD / ENDS

 

Plaid Cymru and the SE Wales Metro

 

Plaid Cymru in Newport and Monmouthshire has long called for the existing railway stations to be significantly upgraded as part of the process of creating a functioning South Wales metro.  Plaid broadly welcomed the report of the South East Wales Transport Commission which has recommend ways to reduce congestion on the M4 motorway without building a new relief road around Newport.  Plaid has called greater investment in public transport, with a much better integration and coordination of rail and bus networks and integrated tickets across all services – with the emphasis that it is needed sooner rather than later.

Monday, November 27, 2023

CAERLEON RAILWAY STATION

Some of us in Newport and Monmouthshire have long called for the existing railway stations in Newport and on the levels to be significantly upgraded as part of the process of creating a functioning South Wales metro.  


We need far greater investment in public transport, with a much better integration and coordination of rail and bus networks and integrated tickets across all services – with the emphasis on sooner rather than later.


The one thing missing from the recommendations of the Burns Commission which included recommendations for new stations at Tredegar Park, Somerton, Llanwern and Magor was any reference to a new railway station to serve Caerleon and Ponthir.


Our City needs ground broken sooner rather than later to bring the new railway stations into being, to provide alternative means of getting around our city and elsewhere, and improved connectivity to Cardiff, Bristol and beyond. 


The new stations are an absolute necessity, a railway station to serve Caerleon / Ponthir should have been included, as this would be a real asset to both communities.


The absence of a railway station to serve Caerleon and Ponthir shows an alarming if not acute lack of understanding of local transport issues, or at best a far to literal linear focus on the problems of the M4 or could have been simply a glaring oversight. 


In this case it’s absence ensures that the residents of Caerleon / Ponthir have little choice but to drive to Newport, Cwmbran and beyond even to reach another railway station. 


If the Labour in Wales government are serious about providing realistic and effective public transport for all parts of Newport and cutting congestion on the M4 and around our city then a railway station to serve Caerleon and Ponthir needs to be added to the consultation and the consultation needs be extended. 

Saturday, May 1, 2021

THE GREAT WELSH TRAIN ROBBERY

Plaid Cymru Leader Adam Price has today vowed that a Plaid government would end Westminster’s “Great Welsh Train Robbery” by investing in creating Wales’s first truly national rail network.




Adam Price hit out at the UK Government’s chronic underinvestment in the Welsh rail network, citing the injustice of Welsh taxpayers footing the bill for England-only projects such as HS2.


The Plaid leader outlined how a national rail network would link major populations such as Bangor and Carmarthen along the west coast, as well as ensure main lines in the north and south, and across central Wales.


Using existing, new and reinstated lines a Plaid Cymru government will also deliver a Valleys CrossRail, connecting Treherbert in the Rhondda to Pontypool, via Pontypridd, Nelso, Ystrad Mynach, Hengoed, Blackwood, Newbridge, and Crumlin.


Adam Price said:


“There is no comprehensive rail network connecting the different parts of Wales with north-south journeys having to be made through England.


“Whilst control of the main rail franchise has been in the hands of the Welsh government, the tracks and infrastructure remain a matter for Westminster which sees Network Rail making decisions on an England-and-Wales basis.


“As a result, Welsh taxpayers are footing the bill for costly projects such as HS2 which are not only set to be built entirely in England but also harmful to the Welsh economy as research shows.


“For as long as Westminster has some control over rail policy, the Great Welsh Train Robbery will roll on.


“This is why a Plaid Cymru government would seek full devolution, with adequate funding, for all rail services in Wales.


“Once this is achieved, we will task Transport for Wales with creating an all-Wales national rail network, connecting the north with the south and enabling rail traffic between the major centers of population.


“This would entail main lines in the north and south, a central Wales line linking Swansea, Llanelli and Shrewsbury, the Cambrian line linking Aberystwyth with Shrewsbury, and a new West Coast line, linking Carmarthen with Bangor and on to Amlwch.


“The Valleys CrossRail will provide a huge boost to business development, urban regeneration and housing as well as transport – directly benefiting a population of more than 250,000 people.


“We would also proceed with plans for metros for the south-east, north-east, Swansea Bay and the Western Valleys.


“This network will support transit-oriented development along its route so that economic development can flourish in the most sustainable and climate responsible way.


“All of this forms part of our vision for an independent Wales, free from Westminster’s constraints and able to truly connect our communities for the benefit of all our people.”


- ENDS - 

Thursday, March 4, 2021

CAERLEON RAILWAY STATION

Plaid Cymru, Newport West Senedd candidate Jonathan T Clark has called for a new railway station to serve Caerleon and Ponthir to be added to the the Burns Commission recommendations as a matter of urgency.  


Jonathan T Clark, Plaid Cymru Newport West Senedd candidate said:


“I like many people in Newport, welcomed the commitment to build new railway stations at Tredegar Park, Somerton, Llanwern, and Magor. We need ground broken sooner rather than later to bring the new railway stations into being, to provide alternative means of getting around our city and elsewhere, once a degree of normality returns after covid. The new stations are an absolute necessity, but I have serious concerns that tno railway station to serve Caerleon / Ponthir has been included, this would a real asset to both communities.”


Jonathan concluded:


“The absence may show an alarming lack of understanding of local transport issues, or to literal linear focus on the problems of the M4 or it could be simply a glaring oversight. In this case it would ensure that the residents of Caerleon / Ponthir have little choice but to drive to Newport, Cwmbran and beyond even to reach another railway station. The lack of a proposed railway station to serve the communities of Caerleon / Ponthir needs to be revisited as a matter of urgency if the Labour in Wales government are serious about providing decent integrated public transport for all parts of Newport and cutting congestion on the M4 and around our city.” 


DIWEDD / ENDS


Plaid Cymru and the SE Wales Metro


Plaid Cymru in Newport and Monmouthshire has long called for the existing railway stations to be significantly upgraded as part of the process of creating a functioning South Wales metro.  Plaid broadly welcomed the report of the South East Wales Transport Commission which has recommend ways to reduce congestion on the M4 motorway without building a new relief road around Newport.  Plaid has called greater investment in public transport, with a much better integration and coordination of rail and bus networks and integrated tickets across all services – with the emphasis that’s needed sooner rather than later.

Friday, February 19, 2021

FEW AND FAR BETWEEN

Some more positive news - for the first time in 56 years, the village was joined to the rail network as the first train stopped on Sunday. The opening was obviously low key as Wales is under a strict Covid-19 lockdown. The 09:12 GMT service from Machynlleth to Aberystwyth stopped to pick up passengers at the Ceredigion village for the first time since 1965. 


The £8 million pound project to reopen the station on the Cambrian Line that connects Aberystwyth and Pwllheli to Birmingham and Shrewsbury has been 11 years in the making. The new single-track halt with a park-and-ride is south of the old station. It closed after 101 years in the 1960s Beeching cuts which saw the end of thousands of stations around the UK. The completion of this project is a very visible first step for the Transport for Wales rail franchise. 


Now while this is good news, the news that Bow Street station is the first station to open in Wales since Pye Corner in Newport more than six years ago (on 14-Dec-2014) should be shocking!  It is important to remember that control of our railway infrastructure investment remains not devolved to Cymru / Wales - a decision made by the then Labour Government in Westminster.  


It still remains with the UK Westminster Government, all the Welsh Labour Government does is draw up a short list of suggestions. And then it wait for Westminster to pick the ones it wants from the list, all the Welsh Labour Government does is draw up a short list of suggestions.

All potential stations go through three stages of assessment, not in Wales but in Westminster / Whitehall:

  • The first looks at Welsh Transport Appraisal Guidance criteria and consideration of the Wellbeing and Future Generations Act.
  • The second looks at the strength of the financial and economic case for a new station and advice from Network Rail on deliverability.
  • The third is "development and assessment of the highest priorities".


To help narrow the list down, station demand forecasts were drawn up which are designed to give a likely viability of proposed stations. This may actually sound a more scientific and rational process than it is. Is it any wonder that nothing gets done or it takes forever. Quite simply decisions about railway infrastructure development and spending need to be made here in Cymru / Wales, not in Westminster - as happens in England, Scotland and Northern Ireland.

Thursday, October 22, 2020

ON THE RIGHT TRACK

Plaid Cymru has always maintained that our railways should be brought into public hands and the government put passengers before profit. So don’t get me wrong, this long overdue - finally bringing the ideologically driven idiocy that has reduced our railways to a poor dividend profit driven service is a good thing. 

Considering where we are this is a sensible measured first step.That said, as yet, there are unanswered questions, the devil is as always in the detail, I would prefer a not for dividend profit model rather than a government controlled railway service. It is important that our railways in the future are independent of day to day, week to week, month to month interference from the current Labour in Wales government in Cardiff, and future Senedd governments. 

Questions need to be answered in relation to the financial implications and also in relation to the nature of the subsidiary. There is obviously a balance to be established, as it is very important that our railways are democratically accountable and are democratically responsive to the needs of our nation, and as yet there are no real details. Decisions of this importance should be announced in the Senedd so that members can ask questions on behalf of the people of Wales and openly scrutinise decisions.



Wednesday, September 9, 2020

SIMPLY PART OF THE PROBLEM

Here in Cymru / Wales we face number of pressing problems, covid aside, the lack of affordable housing, the weaknesses of our economy, the inherent problems with our 19th planning system with its out of touch focus on unitary development plans, and the lack of decent affordable integrated public transport, which are all part of the problem we face. 


For serious times, we need serious government and serious leadership. We lack both at all levels of government. If the governments in Cardiff and London were serious about public transport then our railways then some serious consideration should be given to looking at reconnecting some of our towns to the rail network. A good follow on would be reconnecting Caernarfon, Dolgellau and Builth Wells to the network, and reopening the line to Llangefni and Amlwch on Ynys Mon. 


Locally the re-opening / construction of stations at Caerleon / Ponthir (a well sited, well connected station could serve both communities well), Magor and Llanwern should be priorities. We also need to improving North – South rail communications and rebuild and re-open the Carmarthen to Aberystwyth line. We also need to get road  freight off our roads and back onto our railways. 


In the south east, we need Abergavenny and Chepstow railway stations to be real gateways, with fully integrated local bus services. We need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of safe secure parking facilities. We need feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station at Usk.


The final stage of the rail-link from Ebbw Vale to Newport needs to be completed and along with new railway stations at Caerleon / Ponthir and Magor would help to reduce road congestion. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.


A lack of coherent governance in Cymru / Wales may explain, why when it comes to railways in Cymru / Wales, there is a tendency to focus on anniversaries of rail closures rather than anniversaries of openings. This could be because transport policy was something that was done to us rather than done for us or done by us. I mention this, because back in 2012 I noticed that a plaque had been unveiled marking the 150th anniversary of the arrival of the railway in Knighton (Powys).


The spectacular 22-mile section of the Heart of Wales line from Craven Arms, Shropshire, to Knighton was constructed in 1861, and managed to avoid being closed in the 1950's and 1960's.  A £5m project which upgraded parts of this rural railway was finished in 2011, which reinstated five passing loops at Knighton, Llandrindod Wells and Llanwrtyd Wells in Powys, and at Llandovery and Llandeilo in Carmarthenshire. This was a small but positive step which could, which with extra services could lead to more regular and better used trains.


In the last twenty one years in Wales there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (partially re-opened on Wednesday 6th February 2008).


Being brutally honest these were administrative rather than legislative projects, this has not been the case in Scotland, where bills to reopen old railways were vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.


We face a future where relatively cheap fuel will be a thing of the past, so we need to ensure that all our communities have reasonable access to a reliable cheap system of integrated public transport, at the heart of which needs to be our long neglected rail network. 


The Transport (Wales) Act which came into effect in February 2006 gave the then National Assembly powers to plan and co-ordinate an integrated transport system. New railway stations in Cymru / Wales are mostly (not not entirely) down to seeking approval from Westminster - almost as if devolution does not exist.


The old excuses about a lack of funding (despite the banking related financial crisis) from Westminster are no longer acceptable; Wales making up 5% of the population of the UK, and makes significant contributions to the exchequer over the years - so we need 5% of the UK transport spend, and full control of our transport planning and our transport budget. 


If the current Governments in London and Cardiff are serious about cutting carbon emissions and reducing road congestion then we also need work to get heavy goods back onto our railways. There is no quick fix, but, the time for excuses is over, we need to plan for the future. This may not be cheap but it can be done if the political will is there, as has happened in Scotland, where there is a useful combination of the will, the funding and interested private partners. 


Now let's be honest, with all the best will in the world this is not going to work well, even with the current inert visionless Labour in Wales / Lib Dem coalition government in Cardiff and, as far as Cymru / Wales is concerned an indifferent / hostile Conservative government in Westminster that is openly hostile to the concept of devolution and to the very existence of Cymru / Wales’s very existence.  


The underlying problem is that devolutionary governance can no more be half devolved anymore than someone can be half free. A flawed devolutionary half-way house just won't work anymore, it will not deliver or even give us the chance to deliver, even with the weak / incomplete / flawed legislative powers that the Senydd has. 


The changes and reforms that are necessary to fix the problems in our country, to give Cymru / Wales  the tools to do the job, are unlikely to be gained anytime soon. Even were Cymru / Wales to gain the legislative powers, any future Welsh government would still be in some sort of half devolved limbo state of governance, lacking a fair financial settlement. 


Cymru / Wales need a fair financial settlement, full control of Network Rails budget and priorities within Cymru / Wales so we can construct a decent system of integrated public transport. This is what has happened in Scotland, where significant strides have been made to reopen, redevelop and build a coherent and integrated public transport system, partially due to the fact that Scotland has full control over Network Rails budget and priorities in Scotland. 


The other significant difference between Cymru / Wales and Scotland, aside from geography, lies with our current government in Cardiff Bay. Even if the Labour in Wales / Lib Dem coalition government in Cardiff wanted to do any of this they cannot - they don’t have the powers too, and more importantly they simply lack the political will or necessary vision to even try. How much longer do we have to wait to see some sort of coherent transport plan for Cymru / Wales, let alone the vision? 


Devolution, as is, simply won’t work with the current Westminster Conservative governments 18th century vision of the Union - basically a Greater England - complete with a compliant quit Cymru / Wales which sits as an adjunct to the west of England fulfilling the function as an add on to Bristol with cheaper housing and convenient areas of outstanding national beauty for leisure activities.  Making a observation, that as dominion status is not in the offing, even within a new Brit Empire 2.0, then Independence is the only remaining sensible option. 




Sunday, June 14, 2020

THE ILLUSION OF PROGRESS…

Ken Skates, Labour in Wales’ Transport Minister has written to the UK Government's Secretary of State for Transport, Grant Shapps, setting out a strong argument to build four new stations in Wales. Ken’s note calls on Grant Shapps to invest in the Wales and Borders rail network through the UK Government’s Restoring Your Railways fund.

A report undertaken by Transport for Wales for the Transport Minister Ken Skates has identified four locations for new stations. The developments, which would be paid for under the New Stations Fund 3, would be ready by early 2024.

The 4 stations are:

  • Deeside Parkway, on the Borderlands Line in North Wales
  • Carno, on the Cambrian Mainline in Mid Wales
  • St Clears on the Great Western Mainline in West Wales
  • Ely Mill on the City Line in Cardiff, in South Wales

Ken Skates also said that he took the opportunity to reiterate the case strongly for plans which included the Aberystwyth – Carmarthen and Bangor – Caernarfon re-openings.

Clearly on a roll, the Minister for Economy, Transport and North Wales Ken Skates also stated that the stations would improve access to the rail network across Wales.

The Transport Minister also invited the Transport Secretary to discuss further priorities for rail investment, including new stations at Greenfield and Magor. 

He also wants to use  the New Ideas Fund, to restore passenger services on the line between Gaerwen and Amlwch on Anglesey and wants to use the Accelerating Existing Proposals fund to restore the line and services to Abertillery in South Wales.

No while I don’t have any problems with the proposed new stations or re-opened railway lines - its worth exploring the fact that with 11% of the UK’s railways within Cymru / Wales we have no control of any rail funding or any real input into Network Rails priorities. 

However, we have been here before - back on the 28th August 2019  - perhaps for the Labour in Wales that day was a good day to bury bad news. 

Some even further back story, in April 2017, a list of 12 potential new and revived railway station sites was made public which would have gone a long way towards adding connectively to various parts of our country’s poor railway network and potentially reducing road congestion. 

On the 28th August 2019, it was revealed that the original list of 12 has now become  4  - when another list of 4 was published - perhaps Ken is really good with lists - rather than actual action. Or perhaps in the absence of actually doing anything positive an old press release is re-issued to create the illusion of progress.

Now this was not a definitive list, and there are no guarantees that these 4 prospective railway stations will eventually be built or re-opened as they have to go on for yet further assessment in Westminster. 

The lucky 4 prospective railway stations then were: 

  • Ely Mill/Victoria Park in Cardiff
  • St Clears in Carmarthenshire
  • Deeside Industrial Park/Northern Gateway
  • Carno in Powys

What’s interesting is the railway stations which did not made it through the initial Westminster assessment  - they were:

  • Llanwern
  • Newport Road/Rover Way
  • St Mellons
  • Cockett
  • Landore
  • North Wrexham
  • South Wrexham
  • Llangefni

It is important to remember that control of our railway infrastructure investment remains not devolved to Cymru / Wales - a decision made by the then Labour Government in Westminster.  It still remains with the UK Westminster Government, all the Welsh Labour Government does is draw up a short list of suggestions.

Regardless of whether it was then of now, all potential stations go through three stages of assessment, not in Wales but in Westminster / Whitehall:

  • The first looks at Welsh Transport Appraisal Guidance criteria and consideration of the Wellbeing and Future Generations Act.
  • The second looks at the strength of the financial and economic case for a new station and advice from Network Rail on deliverability.
  • The third is "development and assessment of the highest priorities".

To help narrow the list down, station demand forecasts were drawn up which are designed to give a likely viability of proposed stations. This may actually sound a more scientific and rational process than it is. 

It is worth remembering that the anticipated number of passengers who were expected to travel on the reopened Ebbw Vale line to Cardiff in 12 months travelled on the new service in the first 4 months. 

A word of warning - please don’t hold your breath in anticipation of any regular train service from Ebbw Vale to Newport - we may yet have quite along wait. 

The 7,000 + householders who will end up living on the Llanwern site will have no option but to use their cars or the bus service to get to and from work. 

Not pushing for a railway station at Llanwern continues to directly impact on the congestion in an around Newport, on the SDR and the existing M4. 

Then, as now, any proposal will only be successful with "a sound business case" and the assessment "increases the ability of station proposals to be in a position to benefit from funding calls" - and that decision will be made in Westminster rather than here in Cymru / Wales. 

Back then a Welsh Government spokesman said: "The stations that scored the highest in the assessment will now be taken forward. The proposals for the remaining stations will be considered when additional resources become available." I wonder if the same old tired excuse will be rolled out…

It is also worth noting that, then as no doubt now, the process is ongoing and there is no date for any potential reopening of any station. 

Considering that Westminster has been tearing itself apart over BREXIT for the last few years and the Westminster government, now presided over by Boris has other more things to be concerned about.

That said, even with no pandemic, it would be a safe bet that it may be a while before any Westminster government focuses on Cymru / Wales and our national interests. 

Quite simply decisions about railway infrastructure development and spending need to be made here in Cymru / Wales, not in Westminster - as happens in England, Scotland and Northern Ireland - but don’t hold your breath.

Wednesday, February 12, 2020

A UNION IN NAME ONLY


We have a Labour government in Cardiff Bay that's in denial about the fact that it's in charge and that the buck stops with them. Despite the occasional rhetoric about defending Cymru / Wales - the lack of coherent powers not to mention any real desire to try to acquire or strengthen existing devolved powers let alone acquire any new ones - lies with the Labour Party. 

The 2006 devolution settlement deliberately excluded any control of water - one of our country's key resources (and a potential source of future revenue). It left the then National Assembly with partial control over our county's railways and effectively no real powers to develop, expand or plan for real growth of our nations fragmented railway network. We have 11% of the UK's railway network, 20% of the level crossings and 2% of the funding over the last ten years. 

The HS2 debacle  is an affront to the Welsh taxpayer, and with spiralling costs it is only going to become worse. Wales is losing out on billions of pounds of funding that is rightfully ours – it is simply not tenable for the Westminster Government to argue that this project is 'England and Wales' when not a single inch of track is in our country.

The UK government must immediately commit to honouring its funding formula and pay Wales full Barnett consequential payments of approximately £5 billion. Part of the problem is that the UK government has lied repeatedly over the case for HS2. With the cost for HS2 Phase 1 rising by 361% in the space of 3 years, there are serious questions to be answered concerning project delivery and management by HS2 Ltd and the Government.

The people of Wales deserve honesty from Westminster. While paying for a high-speed electrified railway that will only run in and benefit England, Welsh commuters are lucky to find a seat on dated diesel trains. Powers over rail must be devolved to Wales. The Government's own project accountants have calculated that HS2 will directly harm the Welsh economy. Yet again, Westminster has knowingly delivered a project that will benefit London and the south-east of England at the expense of Wales.

The overall impact of the HS2 project, as it, will actually have a negative impact on the economy of Cymru / Wales. What we need is fair funding and the powers to do the job in Cymru / Wales. A flawed half way house devolutionary settlement will no longer work. Quite simply either the union, post BREXIT is probably incapable of delivering for all, fairly and equally, something the union did not do previously, before and after devolution was implemented, it is simply a union in name only.

Wednesday, November 13, 2019

A NEXT STEP?


Almost half a year ago the First Minister made the right choice about the M4 Relief road. I have been opposed to the project since the 1990's. It's been dropped more times over the years than a questionable county striker. Whats important now - is what happens next to alleviate the traffic problems that regularly clog up our city - the M4 Relief road would have done little to resolve them - despite the promises. If we are serious about giving people a realistic alternative to the car in and around Newport (and elsewhere) then we need decent integrated reliable public transport - without that nothing is going to change. 

Driver training on the Gaer spur (Ian Brewer)
What happens next is now of real significance - there are some small significant and long overdue projects - which would be big wins by way of infrastructure in Newport which should have been completed decades ago. A prime example is that of the proposed re-opening of the railway station at Caerleon - this has been in the structure plan since 1986 - but nothing has been done. Not to mention railway stations at Llanwern and Magor - approved in principle but with no ground broken as the years continue to pass. There are sone relatively simple potentially significant easy wins - which could have a big impact on the congestion problem in and around Newport and on the coastal plain. We need railway stations, with decent facilities and significant park and ride (with sensible walk to routes) at:

  • Caerleon / Ponthir , 
  • Magor, and 
  • Llanwern 
Across the south east, we can start with the Ebbw vale link to Newport needs to be re-timetabled and the line extended to Aberbeeg (as originally promised). Trains already periodically run on this line into Newport - when maintenance is under taken elsewhere. This reinstated service would enable connecting services to be run into Newport - giving commuters to Bristol and further afield an alternative means of getting to and from their places of work. 

Within Newport there is a need to develop a decent system of public transport - based around a light rail / tram network which connects Bettws / Malpas, Duffryn and Pill and Alway / Ringland with the city centre and the railway station(s). At present the residents of Bettws, Pill, Duffryn and Alway / Ringland have no alternative but to drive, use the much reduced bus service or walk. Trams are not a pipe dream they are already an important part of integrated public transport systems in Merton (in south west London), Sheffield, Manchester and elsewhere. They would work equally well in Newport, Cardiff and Swansea and feed people into our main line railway stations. 

Elsewhere in the former county of Gwent there is much work that needs to be done. Our railway stations at Abergavenny, Pontypwl and Cwmbran, Caldicot , Severn Tunnel and Chepstow have all seen some degree of improvement but are barely fit for service. All these stations need improvement and need more stopping services and better facilities hand in hand with the development of secure reasonably priced park and ride facilities. There should be a feasibility study into reopening the branch line to Usk (with a station sited West of the River Usk (with decent park and ride facilities). Along with this there is a case for a park and ride railway station at Little Mill (especially with the proposed hoisting development at Mamihiiad). With all of this we need integrated ticketing - with one ticket coverage all modes of transport - it either well elsewhere in these islands - so why not here? 

The National Assembly also needs to work systematically and over the long term to get long distance freight traffic off our roads and back onto our railways. If you are shipping a container from Neath or Newport to Nuneaton or Namur it needs to be on a train not trundling around the motorway network. Successive Scottish government have had done success with encouraging and incentivising the movement of freight from road back to rail. Hand in hand with this initiative there is a real need to fundamentally change the delivery cycle from last minute to more planned delivery cycle. 

We need workable medium term solutions that will fundamentally impact on our options for moving about our city, the SE and the rest of Wales. What we don't need now is inaction, we gave had plenty of that, combined with poor if not down right bad decision making on the part if government at all levels, be it Westminster, National Assembly and local level - the consequences of which we are all living with every day in the south east and across the rest of Cymru / Wales. The time for excuses us past - what's needed now is action on the ground to begin to sort out our congestion problems and to provide us with decent integrated transport that's fit for the 21st century rather the 20th.